Consultancy: Italy's rich river networks were a focal point for Bundner's hydrologists and engineers. Through detailed studies, we identified the rivers with the highest potential for hydroelectric power.
Execution: Collaborating with local construction firms, Bundner successfully commissioned a hydroelectric power station. This station now taps into the rivers' kinetic energy, supplying a significant portion of Italy's energy demands sustainably.